欧美69视频在线-欧美77777免费视频-欧美8888-欧美91av-欧美97欧美综合色伦图-欧美99

首頁 產(chǎn)品展示>John Deere約翰迪爾強鹿柴油發(fā)動機缸套突出量的測量方法與標(biāo)準(zhǔn)值參數(shù)

John Deere約翰迪爾強鹿柴油發(fā)動機缸套突出量的測量方法與標(biāo)準(zhǔn)值參數(shù)

我們是專業(yè)的John Deere約翰迪爾強鹿柴油發(fā)動機缸套突出量的測量方法與標(biāo)準(zhǔn)值參數(shù)供應(yīng)服務(wù)商.我們可提供John Deere約翰迪爾強鹿柴油發(fā)動機缸套突出量的測量方法與標(biāo)準(zhǔn)值參數(shù)銷售維修保養(yǎng)零配件服務(wù).John Deere約翰迪爾強鹿柴油發(fā)動機缸套突出量的測量方法與標(biāo)準(zhǔn)值參數(shù)想要更多的類型,請現(xiàn)在聯(lián)系湖南英珀威機械有限公司!
產(chǎn)品咨詢

詳細描述

John Deere約翰迪爾強鹿柴油發(fā)動機缸套突出量的測量方法與標(biāo)準(zhǔn)值參數(shù)

1. Secure liners using cap screws and flat washers. Flatwashers should be at least 3.18 mm (1/8 in.) thick.Tighten cap screws to 68 N•m (50 lb-ft).

2. Using JDG451 or KJD10123 Gauge (B) and D17526CIor D17527CI Dial Indicator (C), measure liner height

(A) at 1, 5, 7, and 11 o’clock positions as viewed fromflywheel end of engine. Record all measurements bycylinder number.

Specification

Cylinder Liner—Height aboveBlock 0.030—0.100 mm(0.001—0.004 in.)

Maximum Permissible HeightDifference at Nearest Point ofTwo Adjacent Liners, or Within a

Single Liner................................................................. 0.05 mm (0.002 in.)

IMPORTANT: ONE LINER SHIM ONLY may beinstalled under each liner flange.

3. Remove and shim, or replace, any liner that does notmeet height specifications. (See REMOVE CYLINDERLINERS in Group 030.)

NOTE: Two sizes of shims are available: 0.05 mm (0.002in.) and 0.10 mm (0.004 in.).

氣缸蓋的安裝

1. Dip fuel supply pump push rod (A) (if equipped) inclean engine oil and carefully install in cylinder blockbefore installing cylinder head.

A—Fuel Supply Pump Push Rod

IMPORTANT: The O-ring seals in head gasket can bedamaged if head is repositioned whileresting on engine block. Use guidestuds to position cylinder head onblock.

2. Install two guide studs (B) in cylinder block at locatingholes.

IMPORTANT: ALWAYS thoroughly inspect cylinderhead gasket for possible manufacturingimperfections. Return any gasket thatdoes not pass inspection.

3. Place new head gasket on cylinder block. Do not usesealant; install dry.

4. Position cylinder head over guide studs and lower ontocylinder block.

5. Dip entire cap screw in clean engine oil. Removeexcess oil from screw.

6. Remove guide studs. Install flanged-head cylinderhead cap screws.

7. Tighten all cap screws to specified torques (insequence shown, beginning with No. 1), followingsteps 1—4 below. Then, torque-turn cap screwsfollowing procedure on next page.

Cylinder Head Cap Screws—Specification

Step 1—Initial—Torque ................................................. 100 N•m (75 lb-ft)

Step 2—Second—Torque ........................................... 150 N•m (110 lb-ft)

Step 3—Verify (After 5Minutes)—Torque........................................................ 150 N•m (110 lb-ft)

Step 4—Final—Torque-Turn Tighten each screw an additional60° ± 10°. (See TORQUE-TURNMETHOD FOR PROPERTORQUE in this group.)

Retorque of cylinder head cap screws after enginebreak-in is not required when using the recommendedtorque procedure along with flanged-head cap screw.

免費熱線
400-082-9096?
整機銷售
0731-84424871? 18374999699
售后維修
0731-84424872? 15580888444
配件銷售
0731-84424873? 18274802060
手機端
微信公眾號
主站蜘蛛池模板: 91久久亚洲最新一本| 99久久99久久精品免费看子伦| 99视频一区| 在线私人影院| 不卡国产| 中文字幕久久久久久久系列| 亚洲一区 在线播放| 香蕉网视频| 日韩欧美综合| 欧美aaa毛片免费看| 久久国产成人精品麻豆| 国产人成精品| 成年女人免费视频播放77777| 中文字幕亚洲欧美日韩高清| 亚洲国产美女精品久久久久| 色94色欧美一区| 欧美成人全部免费观看1314色| 久久国产免费观看精品1| 国产视频福利| 99这里只有精品6| 夜精品a一区二区三区| 特级毛片s级全部免费| 欧美性猛交xxxx免费看手交| 久久七国产精品| 国产性精品| 99视频精品全部免费免费观| 亚洲国产网| 欧美精品xxxⅹ欧美| 免费永久欧美性色xo影院| 九九影视网| 国产操穴| 在线观看免费视频a| 亚洲aa在线| 日韩国产欧美| 两性色午夜视频免费老司机| 精品国产品香蕉在线观看75| 国产第一亚洲| 中文国产成人精品久久无广告| 色综合五月天| 免费福利小视频| 国产一国产一级毛片视频在线|